Software Development Life Cycle (SDLC) is
a term used in software industry to describe a process for planning, creating,
testing, and deploying.
SDLC is a framework which defines the tasks to be performed at every phase of Software Development Process.
Software Development Process has
different approaches.
- Waterfall model
- Agile model
- Spiral model
- Incremental model
- Iterative model
- Prototype model
Each model will have different life cycle process in Software Development.
Above mentioned figure represents various phases in Software development life cycle
1. Requirements Gathering
Planning
and Requirements gathering is the initial phase in Software development life cycle. This will be done by Project
Managers by taking input from
Senior team members, Stake holders, Sales department and from Customers. These input will help them in understanding
Product feasibility in different areas.
2. Analysis
In this Phase meetings will takes
place with Managers and team members to understand the requirements and the
technical approach to be followed for implementing and the risks associated.
After all meetings done finally, a
Requirement Specification Document will be created by Project Manager for
further phases.
3. Design
Based on Requirement Specification
Document in this phase Software Design is prepared. Usually more than one
design approach will be documented in Design Document
Specification(DDS).
These Design Document will be
reviewed by all the stack holders based on Design, Risk assessments and Time
Constraints.
4. Coding
This is the longest phase in SDLC. The
actual development of Product will start in this phase. Based on Requirement
Specification Document the work will be divided into modules. Coding will start
by the developers for each module. If the DDS document is
created in detailed manner then coding will be done easily.
5. Testing
After coding done to all the
modules with specified design and requirements the Product will handover for
Testing.
In this Phase the product will
tested in different ways to make sure the product is reliable. Types of testing
may include Functional testing, Integration testing, Regression testing,
Acceptance testing and etc.
In this phase all the Product
defects will be reported, tracked, fixed and re-tested.
6. Deployment and Maintenance
Once the Product is tested and
certified by testers the product will be released to alpha for the team. As
soon as product reflected into Alpha people will start testing and if any
changes required those will be done and final deployment will done to
customers.
Once Customer start using the
Product then the Usability issues will comes up and needs to be solved time to
time. This process will called as Maintenance.